Mahoney’s Reserve Sports Field Re-Construction

By admin ●June ,12 2019 ● Completed Projects

Mahoneys Reseve, WhiteHorse City Council

  • RMS recently completed the Re-Construction of the 1.1 Ha multi purpose sports oval at Mahoney’s reserve Forest Hill. The works included the stripping and removing the top 50 mm thatch layer, Cut to Fill Via 3D machine control to achieve new design levels. Installation of 225 slotted PVC perimeter drain with 1400L/meters of 150 mm Ag drains with 5000L/Meters of gravel sand slits drains. Import of a 100 mm sand root-zone layer with soil amendments incorporated, then lastly Re trim works via machine control with surface ready for washed instant turf.