GreenGully Oval 4 Re-Construction

By admin ●June ,11 2019 ● Completed Projects

GreenGully Oval 4, BrimBank City Council

  • We have recently completed a full reconstruction of Green Gully Reserve Soccer Pitch No.4, which included stripping the pitch of its existing surface and dispose material, Cut to fill of the sub grade to new DTM, installation of civil drainage, pits and also sub surface Ag drains, concrete spoon drain, Black chain link fence with 2 high ball protection fence and concrete footpath to the surrounds, Installation of the irrigation system, construction of a 50mm 5-7mm screenings layer to DTM, construction of a 300mm root zone layer, Turf laying of washed Santa Ana couch to the playing surface, of the pitch and a full 16 week maintenance period of the field