Bon Thomas Reserve , BrimBank City Council

  • RMS has recently completed a full construction of 2 full-size Soccer pitches for Brimbank City Council, which works included stripping the pitch of its existing surface, cut and fill new subgrade to 3D model, importation of 7500m3 of clay fill for new rooftop sub-base, installation of new civil drainage, JP pits and sub base Ag drains, installation of the irrigation system with dual booster pump set, construction of new perimeter fence including 4 high ball protection fences, construction of 600L/m’s of concrete spoon drain, new concrete full-size cricket wicket and concrete surround footpaths, importation of 250mm (9000 ton) root zone layer and level to new DTM, line planting of TifTuf couch sprigs to the playing surface and a full 20 week maintenance period of the field. We removed the existing concrete spoon drain and steel post fence from the boundary of the field, the commenced the cut and fill with the site using a laser-guided dozer and scoop. The site required 6,500m3 of imported fill to build the base up to the design height, which was then leveled and consolidated.
admin Completed Projects