Bolin Bolin Wetlands Stormwater Harvesting Project

By admin ●August ,31 2017 ● Completed Projects

Works for this project commenced in March 2017. The works included in this project are installation of 3Km’s of open trenching or direction drilling DN250mm, DN200mm & DN140mm PE pipe transfer mains, installation of No. 2 dual pump sets with backwash filter, installation of No. 3 submersible transfer pumps housed in concrete wells, installation of multiple valve pits with automatic actuator valves, pulse water meters and all fusion weld connections to new water storage tanks with lastly the connections to existing irrigation systems at Bulleen Park sporting complex and Carey Grammar.

View Project Gallery